How many toilets does a California job site need?
One separate facility for each 20 employees or fraction thereof, of each sex, with at least half of the required facilities being toilets.
Title 8 Section 1526(a) is the rule, and it counts the employees on the site. A site with fewer than five employees may use one single-user toilet designated for all-gender use. The federal tiered table does not apply on a California job site and should not be used to size one.
Where the count is in doubt, the contractor confirms the headcount with the provider before the units are set. The count is based on the employees actually on the site, not on a schedule of planned workers.
Can portable toilets be used on a construction site?
Yes. Where a sewer or water connection is not feasible, Section 1526 allows non-water disposal such as chemical or recirculating toilets, subject to local rules.
That is the subsection that puts portable units on many San Francisco sites without a connection. The provider confirms the local rules for the site before placing units, and the contractor keeps the site consistent with them.
Where a sewer or water connection is available and suitable, the rule for water closets applies, and portable units are not the default.
What about mobile crews and short tasks?
Mobile crews with ready transportation to nearby toilets are excepted under subsection (e).
A crew that moves between sites and can reach toilets nearby without delay may not need units at each site. The exception turns on transport and nearby toilets, not on convenience. A crew that stays on one site for the day, or whose nearby toilets are not close, needs units placed on that site.
The provider can advise on whether a short task qualifies, but the test is the crew's access to toilets, and the contractor confirms it.
What about the early weeks of a job?
Temporary field conditions must have at least one toilet available from the start.
Subsection (b) requires at least one toilet to be available under temporary field conditions. A job that starts with a few workers and a shell still to build can begin with a single unit and add more as the headcount grows. The count is revisited as the crew changes.
The provider sets the first unit before the crew arrives, so the crew is not waiting for a full bank to be sized.
What moves the price on a job site?
The number of employees, the length of the job, the service visits and the access to the site set the quote. The provider explains the price, and it is approved before work starts.
The count of units follows the crew, and the crew changes as the job moves from demolition to framing to finish work. A larger crew needs more units and more visits, and a long job needs its units maintained across many months. The number of units also sets how many service visits the site needs.
Access matters as well. A unit placed on a hill, behind a gate, up stairs or in a rear yard takes more time to set and to service, and the quote reflects that. Any street space permit is pulled by the contractor, and the price is confirmed before delivery.