Street Space Permits for Portable Toilets in San Francisco

When a porta potty sits on a San Francisco street or sidewalk, the Public Works street space permit applies. Covered uses, space limits, placards and lead times.

Illustration for the guide "Street Space Permits for Portable Toilets in San Francisco" (San Francisco, CA)
Short answer

A portable toilet placed on a San Francisco street or sidewalk generally needs a street space permit from San Francisco Public Works. Portable toilets are named among the covered uses, the contractor or property owner pulls the permit, and the placement has limits on how much of the roadway and sidewalk it may take.

Key takeaways

  • Portable toilets are named in the list of covered uses for a San Francisco street space permit, so a unit on the public right of way falls under the permit requirement.
  • Materials and equipment may not take more than one-third of the roadway width or more than half the sidewalk width without an additional permit under Article 15, Section 724 of the Public Works Code.
  • A standard street space permit generally covers the parking lane and up to half the sidewalk along the fronting property.
  • The Additional Street Space Permit is needed for more room, for a four-foot path of travel or for a neighboring frontage, and Public Works says to allow at least 30 days for it.
  • The permittee posts a placard at the site 72 hours before occupancy begins and keeps it up for the whole permit term.
  • Under Section 724.5, the Public Works Director can order corrections when a permittee exceeds the permit's duration or area.

Why does a porta potty on a San Francisco street need a permit?

The public right of way is city space, so occupying it for construction or other purposes needs Public Works' approval. Portable toilets are one of the uses named in that list.

The street, the parking lane and the sidewalk are public space. When a unit is set on them rather than inside a private yard or lot, the placement is an occupancy of the public right of way, and the city manages that through a street space permit. Public Works lists 'placement of contractor offices, portable toilets, and/or equipment, debris boxes in the public right of way' among the covered uses, so a toilet is not an exception to the rule.

A unit set entirely on private ground is a different situation, and the answer depends on where the line between public and private land falls at that address. Do not assume a driveway, a side yard or a shared drive is private until that is confirmed. Ask the Public Works Bureau of Street Use and Mapping to check the placement before the unit is delivered, because a wrong guess is the most common reason a placement has to be moved after the truck arrives.

What does the street space permit actually cover?

The permit covers occupancy of the public right of way for the uses Public Works lists. The unit's space, its duration and its placement are set on the application, and the contractor or property owner pulls it.

The Street Space Request application lists portable toilets alongside scaffolding and debris boxes. It asks for a duration, which runs from one to six months, and for the space the placement will take. The applicant cannot legally occupy the space until a Street Occupancy meeting has been held and the agreement is signed. A unit that arrives before the agreement is signed is ahead of the process, and that is the mistake to avoid.

Public Works frames the permit as the contractor's or property owner's responsibility. That party is named on the application and answers to Public Works if the placement goes wrong. A provider can describe the unit's footprint and the way it will sit on the frontage, which is the information the application needs, but the permit itself belongs to the party doing the work or owning the property. Keep that split in mind when you talk to a provider about who handles what.

How much of the street and sidewalk can a unit take?

Materials and equipment may not take more than one-third of the roadway width or more than half of the sidewalk width without an additional permit. Those fractions are what a placement is checked against.

The Public Works limit is written as a fraction of the space, not in feet. Materials and equipment may not occupy more than one-third of the roadway width and not more than one-half of the sidewalk width. Going beyond those limits needs an additional street space permit under Article 15, Section 724 of the Public Works Code. A single unit on a narrow sidewalk can take up much of that half, so the placement has to be measured against the actual frontage rather than estimated from the street.

In practice, a unit on a narrow street is often placed in the parking lane, which is usually the first part of the frontage a standard permit covers. Where the frontage is narrow or the sidewalk is busy, a second unit can push the placement past the limits without anyone intending it. Count the units, measure the frontage and tell the provider the frontage width before the placement is agreed. A placement that is measured first is much less likely to be changed on the day.

When does the Additional Street Space Permit apply?

It applies when the placement goes past the standard permit: more space than the parking lane and half the sidewalk, a four-foot path of travel that is not kept clear, or an extension into a neighboring frontage. Public Works says to allow at least 30 days for it.

A standard street space permit generally covers the parking lane and up to half the sidewalk width along the fronting property. Going beyond that, keeping a four-foot path of travel, or extending into a neighboring frontage needs the Additional Street Space Permit. Each of those triggers is easy to reach with a bank of units at the curb, since the units take the lane and pedestrians still need a clear path past them.

Public Works says to allow at least 30 days for the additional permit. That lead time sits on top of the standard application, so a placement planned for next week may not be possible if the additional permit is needed. Build the timeline backward from the date the unit must be on site, and treat the 30 days as a minimum rather than a target. Tell the provider early if the placement looks like it will need the additional permit, so the delivery date is set after the permit, not before it.

What is the 72-hour placard and what does it show?

Under Section 724.3 of the Public Works Code, the permittee posts a placard at the site 72 hours before occupancy begins and keeps it up for the whole permit term.

The placard shows the permittee's details, the permit dates and the area the permit covers. Posting it makes the placement visible to anyone checking the street, which is the reason the code requires it. The placard is not a formality. It is supposed to stay up for the full permit term, and a placard that comes down early is as much a problem as one that never went up.

Plan the placard as its own step. The 72 hours run before occupancy begins, not before the unit is delivered, so the clock starts from the day the unit is first used. Confirm both dates with the provider: the delivery day and the first day of occupancy. Set the placard date from the occupancy date, and keep a dated photo of the posted placard in the job file in case anyone asks later.

What happens if the unit stays longer or takes more space than the permit says?

Public Works can order corrections. Section 724.5 lets the Director act when a permittee exceeds the permit's duration or area, so the permit dates and the footprint need to be right from the start.

A unit left on the street after the permit term ends, or one that spreads past the area on the permit, is a problem the city can correct. Section 724.5 of the Public Works Code lets the Director order those corrections when the permittee goes over the duration or the area the permit allows. The order is addressed to the permittee, which is why the permit belongs to the party responsible for the placement.

Keep a copy of the permit with the placard, and set a reminder for the end of the term. If the job will run longer than the permit, apply to extend it before the dates lapse rather than hoping no one notices. A long rental on a street is a common case, so ask the provider to schedule the pickup around the permit end date and to confirm the pickup in writing.

How long does the application take and what does it ask for?

The application asks for the duration and the area to be occupied. The additional permit needs at least 30 days, and the Street Occupancy meeting and signed agreement must come before the space is used.

The Street Space Request application lists portable toilets with scaffolding and debris boxes, which tells you the unit is handled with the same kinds of occupancy as those items. It asks for the duration, which runs from one to six months, and for the space the placement will take. A placement planned for a short event still has to be applied for in those terms, and the duration on the form should match the rental term you agreed with the provider.

Public Works also has an online street space permit fee calculator, which is the tool for working out the fee. Use it with the duration and the area in hand, rather than guessing from another job. The fee is a city charge separate from the rental, so it belongs on its own line in the budget. The long-term portable toilet rental page covers how multi-month placements are scheduled.

Who pulls the permit and where should you start?

The contractor or property owner pulls the street space permit. Start with the fee calculator and the Public Works Bureau of Street Use and Mapping, then agree the placement with the provider before the application is filed.

Public Works frames the requirement around the contractor or property owner, and that is the party named on the application. The provider's job is to describe the unit, its footprint, the delivery route and the pickup, so the application describes the placement accurately. Neither the caller nor the provider should be presented as the one who obtains the permit, and any quote or contract should say so in plain words.

Begin with the duration and the frontage, because those set the size of the permit. Use the fee calculator to estimate the city charge, and contact the Bureau of Street Use and Mapping with questions about the placement itself. Once the permit and the placement are settled, call (888) 351-0294 to book the unit, so the delivery date follows the permit and not the other way round. For the wider cost picture, see the cost guide.

Frequently asked questions

Do I need a permit for a porta potty in my own driveway?

The street space permit covers the public right of way, so a unit set entirely on private property may sit outside it. Where the line between public and private ground falls depends on the site and the address. Ask Public Works before the unit is placed, and do not assume a driveway is private until that is confirmed.

Who pays for the street space permit?

The contractor or property owner pulls the permit, and the fee is a city charge. The amount depends on the duration and the area, so use the Public Works fee calculator to estimate it. The provider's rental price is a separate charge. Keep the two on separate lines so the permit cost is not mistaken for part of the rental.

Can a unit go in the parking lane without an additional permit?

A standard street space permit generally covers the parking lane and up to half the sidewalk width along the fronting property, so a unit placed there is usually within the standard coverage. The placement still has to fit the permit's area and duration. Check the exact spot against the permit before delivery.

How long before a unit can be placed on a street?

The Additional Street Space Permit needs at least 30 days from Public Works. The standard application also has to reach a Street Occupancy meeting and a signed agreement before the space can be occupied. Start the paperwork early, and treat 30 days as the minimum for the additional permit rather than the expected time.

What is the placard and who posts it?

The placard is a sign posted at the site under Section 724.3 of the Public Works Code. It shows the permittee's details, the permit dates and the area covered. It must go up 72 hours before occupancy begins and stay up for the whole term. The permittee posts it, not the provider, so confirm who is doing it before delivery.

Does the street space permit cover a block party or a festival?

Events on closed streets go through a different process. Street closures for special events are reviewed by ISCOTT, which the SFMTA chairs, and that process has its own guide. The street space permit covers occupancy of the right of way by a unit or equipment. Ask which process applies to your event before assuming one permit covers it.

Sources

  1. San Francisco Public Works

This guide is general information for San Francisco County homeowners, not a substitute for an on-site inspection. Prices are estimates. See our disclaimer.